School
St. Mary’s Girls Mumias School
A school energy-storage project designed to reduce electricity costs and support sustainable bakery operations.
Read Case StudyA whole-school clean-energy project supporting classrooms, a posho mill, bakery, and water pumping while reducing reliance on an unpredictable national grid.
The Challenge
The school relied heavily on the national grid, a costly and unpredictable source that strained the school budget.
The Response
Megatank supplied two GC25-50 systems to support learning and important operational equipment.
The Impact
Plan your energy project
Talk to the Megatank team about the right energy-storage and solar configuration for your site.