School
St. Clare’s Butula School
A Busia County school installation designed to cut electricity costs by up to 95% while powering learning facilities and water pumping.
Read Case StudyA Machakos school installation created to improve energy reliability, reduce grid dependence, and support modern learning needs.
The Challenge
Electricity was a constant concern. Frequent outages, high bills, and unreliable power made studying difficult, limited access to water, and interrupted daily routines.
The Response
Megatank installed a GCI50-100PC energy-storage system for the school community.
The Impact
Plan your energy project
Talk to the Megatank team about the right energy-storage and solar configuration for your site.