School
Early Bird School
A Machakos school installation created to improve energy reliability, reduce grid dependence, and support modern learning needs.
Read Case StudyA Kilifi County school energy-storage installation created to reduce electricity costs and maintain stable power for classrooms, laboratories, and administration.
The Challenge
Power outages caused disruptions, while electrical failures created operational difficulties for the school.
The Response
Megatank installed an Ener Hexon Solution 103P energy-storage system.
The Impact
On Site
Plan your energy project
Talk to the Megatank team about the right energy-storage and solar configuration for your site.