The school is located in the Mt. Elgon, Kimilili–Chwele area, about 200km from Nairobi. Electricity costs are high at approximately USD 0.20/kWh, and the monthly electricity bill reaches KES 100,000–500,000. Electricity consumption is higher during the day and lower at night.
The Response
Megatank Solution
The system combines Megatank energy storage with a school-scale photovoltaic array.
1 × GC50-100
120 × 500W PV panels
The Impact
System Benefits
Cutting electricity costs by up to 75% while ensuring reliable and uninterrupted power
Savings can be redirected to learning facilities, ICT infrastructure, and student welfare
Lower electricity bills gradually cover the system cost, supporting practical and financially sustainable solar energy
A Bungoma County school project expected to reduce electricity bills by 90% while supporting classrooms, dormitories, laboratories, administration, and dining facilities.