Water Well Factory, Kajiado

Factory

Water Well Factory, Kajiado

A Kajiado factory project designed to protect operations from grid instability, reduce production downtime, and eliminate diesel-generator dependence.

Borehole Farm, Kajiado County, Kenya Kenya
← Back to Case Studies

The Challenge

Background

Unreliable grid power can expose a water-well factory to equipment damage from voltage fluctuations and costly production downtime during outages. Both problems can significantly increase operational costs.

The Response

Megatank Solution

Megatank supplied a GC100-215 system with a large photovoltaic array for reliable factory operation.

  • 1 × GC100-215
  • 400 × 500W PV panels

The Impact

System Benefits

  • Significantly reduced electricity costs
  • Uninterrupted operation
  • Eliminates the need for costly and polluting diesel generators

Plan your energy project

Looking for a similar solution?

Talk to the Megatank team about the right energy-storage and solar configuration for your site.

Get in Touch

Let us help you get your project started.

Contact

 +44(0)20 3156

 

 +1 866 512 0268

Start your project