Butere Girls High School

School

Butere Girls High School

A school solar and storage installation intended to reduce electricity costs by up to 90% and keep learning activities running through grid outages.

Marama Central, Butere, Kenya Kenya
← Back to Case Studies
Up to 90%Expected Electricity-Cost Reduction

The Challenge

Background

Frequent power outages and high electricity bills disrupted learning. Science practicals and computer assignments were often postponed or cancelled because of the lack of power, affecting students’ progress and morale.

The Response

Megatank Solution

Megatank supplied an all-in-one energy-storage system supported by a large photovoltaic array.

  • 1 × GC100-215
  • 232 × 500W PV panels

The Impact

System Benefits

  • Electricity costs are expected to drop significantly by up to 90%
  • Uninterrupted power even during outages
  • Accessible financing options reduce the burden of high upfront costs

Plan your energy project

Looking for a similar solution?

Talk to the Megatank team about the right energy-storage and solar configuration for your site.

Get in Touch

Let us help you get your project started.

Contact

 +44(0)20 3156

 

 +1 866 512 0268

Start your project